Catania

Logo-EtnaRail

F.C.F. in association with other major international firms, has submitted a proposal to build the regional province of Catania, in project financing, a monorail system consisting of 3 lines in the metropolitan area to the North of the city of Catania worth about € 550,000,000. The project has been recently approved and requires the latest permissions to be started. The departure of the work should happen by 2016. The construction will require 3 years. The first line to be built will be the green line totalling € 260,000,000.

LOGHI

mappa-linee2

Mean daily travel450 Km
Train Length21 m
BidirectionalNO
Guide beam width900 mm
Max Speed90 Km/h
Acceleration1.1 m/sec²
Deceleration1.2 m/sec²   ± 20%
Min Curvature radius20 m
Operative life30 years
Number of axis for bogie2
Max load for axis13 Ton
Number wheel per axis2
Number of stabilizer wheels6 for boogie
Motor typePermanent Magnet
Input power450 V DC
SuspensionsAir
Brake systemIdraulic-Friction
Car power480 Kw
Control systemATO
GuideDriveless
Route Green Orange RedTotal
LengthKm 9,249,694,1523,08
Travel timemin20209
N ° cars2226
Frequencymin3:502:411:32
Stop timesec232323
Stops107421
Commercial velocitykm/h282828

Render Prototype

Mobida_01 Mobida_02 Mobida_03 Mobida_04 Mobida_05 Mobida_06 Mobida_07

Building

FCF_02 FCF_01

Render Prototype station

ST07 ST06 ST05 ST04 ST03 ST02 ST01